Attaching Risk Controls To An Evidence
Introduction
Attach an Evidence to a Risk Control to automatically update Implementation Levels
Linking A Risk Control
Navigate to the Compliance Evidence module
Open the details page of the evidence that is going to be used
On the details page, scroll down and click on ‘Controls’
Click on the ‘Risk’ tab in the controls accordion
Click on the ‘+/-’ sign called ‘Link / Unlink Risk Controls’
On the right side of the pop-up, select the Risk Controls that are going to be linked
Click the leftward facing arrow to move the control over
Click ‘Submit’
Unlinking A Risk Control
Navigate to the Compliance Evidence module
Open the details page of the evidence that is going to be used
On the details page, scroll down and click on ‘Controls’
Click on the ‘Risk’ tab in the controls accordion
Click on the ‘+/-’ sign called ‘Link / Unlink Risk Controls’
On the left side of the pop-up, select the Risk Controls that are going to be unlinked
Click on the rightward facing arrow to move them over
Click ‘Submit’